top of page
The Capitol-INT.IDv001-PXC-2019-CP.3-16.20 copy 3.png


Nashville, Tn.


Project production director ⎮ Theatre-Stage production designTechnical + production services

CAP-T Main.png

Facade treatments proposed

CT-MB2.png
CT-MB3.png
CT-MB1.png
CT-MB4.png
TCTS-FACADE-9.18_PAINT_OPTIONS (2).png
IMG_7014 2.jpg

Final Paint Treatment

Theatre-Stage refurbishment phase

CT-Theater-Pano.png

Stage design proposed

CT-STAGECONCEPT1.png

Interior

IMG_3852.HEIC
IMG_3832.HEIC

interior Treatments proposed 

CT-R1.png
CT-R2.png

Project status: Started July 2019. Stopped Production March 1 2020 due to Covid -19 Epidemic. PROJECT ON HOLD at this time.

Original 1930 (250) Balcony Seats

Seats-Orig.JPG
CT-Balconyfloor.png

Refurbish project 1930 (250) Balcony Seats

CT-Seats2.HEIC

Bar Area phase 1

IMG_2718.HEIC
CT-bar2.png
CT-Bar1.JPG
CT-BAR-REF.JPG

Mezz-Level 2: phase 1, refurbishment

CT-L2-REF-WIDE.HEIC
IMG_3413.HEIC
CT-L2-FE-RR-LIPS.png
IMG_4163.HEIC
bottom of page